Timber TimberComplexity in Woodde
2023-2023Shura Golf Clubhouse, Saudi-Arabien

Freiform, Holzbauentwicklung mit Planung bis Abschluss, Blumer Lehmann AG

2021-2021A Ritz Carlton Reserve, Saudi-Arabien

Freiform, Verkauf und Umsetzung, Blumer Lehmann AG

2017-2017Swatch HQ, Biel, CH

Freiform Montagekonzept und Bauführung Holzbau, Blumer Lehmann AG

2016-2016Cambridge Mosque, Cambridge, UK

Freiform Projekt Management bis Umsetzung, Blumer Lehmann AG

David P

We are Timber Timber, Stefan Bischof and Jephtha Weiss

About

ur expertise in timber construction was called upon from an early stage. For structural reasons, the load-bearing internal walls were constructed using cross-laminated timber. Furthermore, as they are located at an altitude of 1,444 m above sea level, the buildings required special construction features, namely a specially customised rear-ventilated facade and huge rafters with a diameter of 40 cm to handle heavy snowfall. Both apartment buildings are designed as prefabricated timber structures from the second floor upwards. The overall look of the facade, with its pressure-treated shuttering, is defined by the interplay of the upright, horizontal and vertical spruce slats.

Profilbild Stefan

Services

Projektentwicklung & Machbarkeit

Tragwerks- und Systemkonzepte

Variantenstudien und technische Risikoanalysen

Holzbaukostenplanung und Wirtschaftlichkeitsbewertungen

Unterstützung in Wettbewerben und frühen Entwurfsphasen

Entwicklung von ökonomischen Leitdetails 

Engineering & Tragwerksplanung

Entwicklung effizienter, fertigungsgerechter Holztragwerke

Integration von Statik, Brandschutz, Akustik und Bauphysik

Optimierung von Materialeinsatz, Bauabläufen und Montageprozessen

DSC04235 2

Contact

Timber Timber AG
Development, Engineering & Project Management of complex timber structures