Timber TimberComplexity in Wooden
2024      Campus Wattwil, Schulgebäude, CH

Projektentwicklung Tragwerk und Gebäudehülle, Blumer Lehmann AG

2023-2023Shura Golf Clubhouse, Saudi-Arabien

Freiform, Holzbauentwicklung mit Planung bis Abschluss, Blumer Lehmann AG

2022-2022Klanghaus Toggenburg, Unterwasser, CH

Freiform, Projektentwicklung, Gebäudehülle, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2021-2021A Ritz Carlton Reserve, Saudi-Arabien

Freiform, Verkauf und Umsetzung, Blumer Lehmann AG

2021-2021Provisorische Sporthallen, Zürich, CH

Modulare Sporthallen, Holzbauentwicklung, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2021-2021Sporthalle Rietwis, Wattwil, CH

3-Fach Sporthalle, Entwicklung bis Ausführung, Blumer Lehmann AG

2018-2018Apple Store Central World, Bangkok, TH

Freiform, Holzbauentwicklung bis Umsetzung, Blumer Lehmann AG

2018-2018Golf Clubhouse Extension Nine Bridges, Yeoju, KR

Freiform, Projekt Management bis Umsetzung, Blumer Lehmann AG

2017-2017Swatch HQ, Biel, CH

Freiform Montagekonzept und Bauführung Holzbau, Blumer Lehmann AG

2016-2016Cambridge Mosque, Cambridge, UK

Freiform, Projekt Management bis Umsetzung, Blumer Lehmann AG

2015-2015Omega Museumneubau, Biel, CH

Skelettbau, Montagekonzept und Bauführung Holzbau, Blumer Lehmann AG

2014-2014Chäserrugg Berggasthaus, Toggenburg, CH

Projektentwicklung, Innenausbau, Montageleitung und Planung bis Abschluss, Blumer Lehmann AG

2013-2013Säntispark Hotel, Abtwil, CH

Modulbau Projekt Management bis Umsetzung, Blumer Lehmann AG

2013-2013Industriepark Morgenstern, Frauenfeld, CH

Industriebau, Montageleitung auf Baustelle, Blumer Lehmann AG

2013-2013Le Rosey Concert Hall, Rolle, CH

Montageleitung auf Baustelle, Blumer Lehmann AG

2012-2012Tamedia Büroneubau, Zürich, CH

Montage Co-Leitung, Blumer Lehmann AG

2011-2011Sporthalle RSA, Sargans, CH

4-Fach Sporthalle, Montageleitung auf Baustelle, Blumer Lehmann AG

2010-2010Golfclub Hillmaru, Südkorea

Freiform, Montage Co-Leitung, Blumer Lehmann AG

2008-2008Golfclubhaus Haesley Nine Bridges, Yeoju, Südkorea

Freiform, Montage vor Ort, Blumer Lehmann AG

2001-2001Schilliger Halle Neubau Plattenwerk, Haltikon/Küssnacht, CH

Industriebau, Co-Projektentwicklung, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2000-2000Gebäude Turmfalke, Andermatt, CH

Mehrgeschossige Wohnbauten, Projektleitung mit Planung bis Ausführung, Blumer Lehmann AG

Campus wattwil rendering gesamtansicht holzbau blumer lehmann

The two timber ‘TurmfalkeSuites’ buildings include 50 accommodation units, a wellness and fitness area and an indoor golf facility. They are located in the new Anderrmatt Reuss holiday village, which is part of the flagship ‘Andermatt Swiss Alps’ tourism project. Blumer Lehmann was responsible for the timber construction of the accommodation buildings, including the support structure and facade cladding.

Despite the large scale of the two timber apartment buildings, the elegant TurmfalkeSuites still have a distinct chalet feel. All 47 of the studios and apartments have a high-quality design featuring lots of wood.

Our expertise in timber construction was called upon from an early stage. For structural reasons, the load-bearing internal walls were constructed using cross-laminated timber. Furthermore, as they are located at an altitude of 1,444 m above sea level, the buildings required special construction features, namely a specially customised rearventilated facade and huge rafters with a diameter of 40 cm to handle heavy snowfall.

Both apartment buildings are designed as prefabricated timber structures from the second floor upwards. The overall look of the facade, with its pressure-treated shuttering, is defined by the interplay of the upright, horizontal and vertical spruce slats.

Turmfalken andermatt mehrfamilienhaeuser holzbau engineering blumer lehmann

Our expertise in timber construction was called Our expertise in timber construction was called upon from an early stage. For structural reasons, upon from an early stage. For structural reasons, the load-bearing internal walls were constructed the load-bearing internal walls were constructed using cross-laminated timber. Furthermore, as they using cross-laminated timber. Furthermore, as they are located at an altitude of 1,444 m above sea level, the buildings required special construction features, namely a specially customised rear-ventilated facade and huge rafters with a diameter of 40 cm to handle heavy snowfall.

Both apartment buildings are designed as prefabricated timber structures from the second floor upwards. The overall look of the facade, with its pressure-treated shuttering, is defined by the interplay of the upright, horizontal and vertical spruce slats.

Turmfalken andermatt fassade holzbau engineering blumer lehmann
2024      Campus Wattwil, Schulgebäude, CH

Projektentwicklung Tragwerk und Gebäudehülle, Blumer Lehmann AG

2023-2023Shura Golf Clubhouse, Saudi-Arabien

Freiform, Holzbauentwicklung mit Planung bis Abschluss, Blumer Lehmann AG

2022-2022Klanghaus Toggenburg, Unterwasser, CH

Freiform, Projektentwicklung, Gebäudehülle, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2021-2021A Ritz Carlton Reserve, Saudi-Arabien

Freiform, Verkauf und Umsetzung, Blumer Lehmann AG

2021-2021Provisorische Sporthallen, Zürich, CH

Modulare Sporthallen, Holzbauentwicklung, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2021-2021Sporthalle Rietwis, Wattwil, CH

3-Fach Sporthalle, Entwicklung bis Ausführung, Blumer Lehmann AG

2018-2018Apple Store Central World, Bangkok, TH

Freiform, Holzbauentwicklung bis Umsetzung, Blumer Lehmann AG

2018-2018Golf Clubhouse Extension Nine Bridges, Yeoju, KR

Freiform, Projekt Management bis Umsetzung, Blumer Lehmann AG

2017-2017Swatch HQ, Biel, CH

Freiform Montagekonzept und Bauführung Holzbau, Blumer Lehmann AG

2016-2016Cambridge Mosque, Cambridge, UK

Freiform, Projekt Management bis Umsetzung, Blumer Lehmann AG

2015-2015Omega Museumneubau, Biel, CH

Skelettbau, Montagekonzept und Bauführung Holzbau, Blumer Lehmann AG

2014-2014Chäserrugg Berggasthaus, Toggenburg, CH

Projektentwicklung, Innenausbau, Montageleitung und Planung bis Abschluss, Blumer Lehmann AG

2013-2013Säntispark Hotel, Abtwil, CH

Modulbau Projekt Management bis Umsetzung, Blumer Lehmann AG

2013-2013Industriepark Morgenstern, Frauenfeld, CH

Industriebau, Montageleitung auf Baustelle, Blumer Lehmann AG

2013-2013Le Rosey Concert Hall, Rolle, CH

Montageleitung auf Baustelle, Blumer Lehmann AG

2012-2012Tamedia Büroneubau, Zürich, CH

Montage Co-Leitung, Blumer Lehmann AG

2011-2011Sporthalle RSA, Sargans, CH

4-Fach Sporthalle, Montageleitung auf Baustelle, Blumer Lehmann AG

2010-2010Golfclub Hillmaru, Südkorea

Freiform, Montage Co-Leitung, Blumer Lehmann AG

2008-2008Golfclubhaus Haesley Nine Bridges, Yeoju, Südkorea

Freiform, Montage vor Ort, Blumer Lehmann AG

2001-2001Schilliger Halle Neubau Plattenwerk, Haltikon/Küssnacht, CH

Industriebau, Co-Projektentwicklung, Planung und AVOR bis Ausführung, Blumer Lehmann AG

2000-2000Gebäude Turmfalke, Andermatt, CH

Mehrgeschossige Wohnbauten, Projektleitung mit Planung bis Ausführung, Blumer Lehmann AG